Modelling of network schedule including priority of selected technical resources

Anna Jakubczyk-Gałczyńska

Abstrakt

The paper presents a method of network planning CPM – Critical Path Method. The author compares models of optimal solutions to design deadlines for individual works, taking various leading technical resources such as is labor and a tower crane into account.

Słowa kluczowe: network programming, optimization, technical resources
References

Kapliński O. i in., An attempt of management process standardization at the stage of planning and implementation of construction Project, 57th Annual Scientific Conference, Poland 2011.

Patan M., Programowanie sieciowe. Metoda ścieżki krytycznej [Network programming. Critical path method] (www.issi.uz.zgora.pl), Poland.

Jaworski K.M., Metodologia projektowania realizacji budowy (Design methodology of the construction), PWN, Warszawa 1999.

Tangible Directories Expenditures (Katalogi Nakładów Rzeczowych): KNR 2-01 Budowle i roboty ziemne (Buildings and earthworks), ORGBUD, wyd. 2, 1987–1996; KNR 2-02 Konstrukcje budowlane [Building Construction], ORGBUD. Wyd. specjalne, 1998.

Marcinkowski R., The optimization criteria for construction schedules, Inżynieria Morska i Geotechnika, Vol. 5, 2013, 373-376.

Sharma S.C., Operation Research: Pert, Cpm and Cost Analysis, Discovery Publishing House, 2006.

Kristowski A., The statistical tools and the investigation of relationships between the cause and the result in projecting of building works, Logistyka, Vol. 6, 2010, 1617- 1622.