Optimization of construction schedules with the assumed multi-tasking of working brigades

Michał Krzemiński

Abstrakt

The paper presents a newly developed model aimed at minimizing the downtime in working brigades work. The developed method is dedicated to the construction planned using the stream method of work
organization. The model focuses on the assumption of multi-tasking of working brigades. It has been possible to model the performance depending on the type of brigade and the type of work being performed. The article also shows an example illustrating the results of the model’s operation.

Słowa kluczowe: flowshop models, slack minimization, construction schedules
References

[1] Biruk S., Jaśkowski P., Scheduling construction of multi-object projects: problem of works continuity in consecutive units, Zeszyty Naukowe WSOWL, 3 (157), 2010, 340–349.
[2] Hejducki Z., Scheduling Model of Construction Activity with Time Couplings, Journal of Civil Engineering and Management, 9:4, 2003, 284–291.
[3] Krzemiński M., Use of the KASS Program in Scheduling, Technical Transaction, 2-B(6), 2014, 217–224.
[4] Marcinkowski R., Metody rozdziału zasobów realizatora w działalności inżynieryjno - budowlanej, WAT, Warszawa 2002.
[5] Pinedo M.L., Scheduling: Theory, Algorithms, and Systems, Springer, 2012.
[6] Rogalska M., Bożejko W., Hejducki Z., Time/Cost Optimization Using Hybrid Evolutionary Algorithm in Construction Project Scheduling, Automotion in Construction, 18, 2008, 24–31.